22/08/2016 - Development

Progress at Verto Apartments has moved indoors as the installation of kitchens and bathrooms commence on the Ground and First Levels turning these empty spaces into homes. Internal doors have been installed on all levels as well as all plasterboard wall linings. Window installation to Level Four has been completed with the curtain wall system,…

22/08/2016 - Development

The latest on the progress on Bellus Apartments consists of extensive structural and concrete work. As such there isn’t a lot of interesting points to report as this part of the build takes place. However the work that has been made is progressing well with the structure now complete up to Level Two. Structural framing is underway on Level Two and Three…

30/06/2016 - Development

The Bellus site is now full steam ahead with all of the basement walls constructed the building is now progressing above street level. Under slab drainage, construction of the foundation and lift cores are also completed within the basement. Internal work on the basement including installation of the storage lockers and car park allocations will…

30/06/2016 - Development

In viewing the recent construction photography at the Verto Apartment site its easy to see all the progress that the Kalmar Construction team have be making. Insulation and wall linings have been installed in all ground and first floor apartments. The second and third floors are in the process of having insulation and wall linings installed. Framing work continues…